Environmental Documents

Print
Press Enter to show all options, press Tab go to next option

Environmental Review Documents

This page contains environmental documents related to project applications or planning documents processed by the Planning & Community Development Department and does not contain documents administered by other City departments.

Please note, effective January 1, 2019 the California Department of Fish and Wildlife (CDFW) will increase their CEQA filing fees. 

Santa Cruz Resource Recovery Facility Ponds Restoration Project

Rail Trail Segment 7 (Phase II) Project

335 Golf Club Drive: Public Comment Period is May 21, 2018 - June 19, 2018

San Lorenzo River Parkway Phase III: Public Comment Period is May 18, 2018 - June 18,2018

Rail Trail Segment 7 (Phase I) Project

DOWNTOWN PLAN AMENDMENTS FINAL EIR:

Cover and Title Page

Table of Contents

1. Introduction

2. Summary

3. Project Description

4. Environmental Evaluation Introduction

5. CEQA Considerations

6. References

Downtown Recovery Plan, General Plan and Local Coastal Plan Amendments

2120 Delaware Avenue

1930 Ocean Street Extension Project

Cover and Title Page

Table of Contents

1. Introduction

2. Summary

3. Project Description

4. Environmental Evaluation Introduction

5. CEQA Considerations

6. References

  • Appendix A Notice of Preparation and Initial Study
  • Appendix B Department of Transportation, Comments to NOP
  • Appendix C Air Quality and GHG Emissions Calculations
  • Appendix D Project Studies, Geotechnical Feasibility Investigation

 Plans

 

 Reports

Santa Cruz Wharf Master Plan

735 Meder Street, Kissing Corbach Residence

3004 Mission Street

San Lorenzo River Lagoon Interim Management Program

La Bahia Hotel Final Environmental Impact Report

La Bahia Hotel

La Bahia Hotel Draft Environmental Impact Report

Ocean Street Area Plan

 General Plan 2030

1927 Ocean Street Extension - Proposed relocation of Santa Cruz Memorial crematory, construction of 665 square foot addition to an existing storage building to create a crematory building, and construction of a 1,500 square foot landscape maintenance building

555 Pacific Avenue - Four-story mixed-use building with 94 Small Ownership Units (SOUs) and 4,680 square feet of ground-floor commercial space and one basement-level of parking

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer